Manufacturing blueprint
Medium Warhead Flare Catalyst I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 20 | 19 | 18 | 42.17k | 843.36k | |
| 13 | 13 | 12 | 2.43k | 31.61k | |
| 18 | 18 | 17 | 2.92k | 52.57k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
1.1m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 927.54k | 885.37k | 837.85k |
| Profit / unit | 176.66k | 218.83k | 266.35k |
| Margin | 16.0% | 19.8% | 24.1% |