Medium Warhead Calefaction Catalyst I blueprint

Manufacturing blueprint

Medium Warhead Calefaction Catalyst I

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
28 27 26 42.17k 1.18m
23 22 21 2.43k 55.93k
18 18 17 2.92k 52.57k

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 1.53m ISK
ME 0 ME 5 ME 10
Materials / unit 1.29m 1.24m 1.2m
Profit / unit 236.84k 281.43k 328.95k
Margin 15.5% 18.4% 21.6%