Manufacturing blueprint
Medium Warhead Calefaction Catalyst I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 28 | 27 | 26 | 42.17k | 1.18m | |
| 23 | 22 | 21 | 2.43k | 55.93k | |
| 18 | 18 | 17 | 2.92k | 52.57k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
1.53m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 1.29m | 1.24m | 1.2m |
| Profit / unit | 236.84k | 281.43k | 328.95k |
| Margin | 15.5% | 18.4% | 21.6% |