Medium Bay Loading Accelerator I blueprint

Manufacturing blueprint

Medium Bay Loading Accelerator I

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
26 25 24 42.17k 1.1m
20 19 18 2.43k 48.63k
18 18 17 2.92k 52.57k

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 1.15m ISK
ME 0 ME 5 ME 10
Materials / unit 1.2m 1.15m 1.11m
Profit / unit -43.06k 1.54k 49.06k
Margin -3.7% 0.1% 4.2%