Manufacturing blueprint
Small Bay Loading Accelerator I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 6 | 6 | 6 | 42.17k | 253.01k | |
| 4 | 4 | 4 | 2.43k | 9.73k | |
| 3 | 3 | 3 | 2.92k | 8.76k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
313.08k ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 271.5k | 271.5k | 271.5k |
| Profit / unit | 41.59k | 41.59k | 41.59k |
| Margin | 13.3% | 13.3% | 13.3% |