Manufacturing blueprint
Large Warhead Calefaction Catalyst I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 138 | 132 | 125 | 42.17k | 5.82m | |
| 116 | 111 | 105 | 2.43k | 282.06k | |
| 89 | 85 | 81 | 2.92k | 259.93k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
7.12m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 6.36m | 6.08m | 5.76m |
| Profit / unit | 760.94k | 1.04m | 1.36m |
| Margin | 10.7% | 14.6% | 19.1% |