Manufacturing blueprint
Large Bay Loading Accelerator I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 127 | 121 | 115 | 42.17k | 5.36m | |
| 102 | 97 | 92 | 2.43k | 248.02k | |
| 89 | 85 | 81 | 2.92k | 259.93k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
5.91m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 5.86m | 5.59m | 5.31m |
| Profit / unit | 49.32k | 326.16k | 603.01k |
| Margin | 0.8% | 5.5% | 10.2% |