Large Targeting Systems Stabilizer I
This ship modification is designed to reduce a ship's targeting delay after de-cloaking at the expense of shields. The drawbacks of fitting this rig may be reduced by training the Electronic Superiority Rigging skill.
200 kg
20 m³
3.76m ISK
Jita
Attributes & capabilities
Structure
1
Miscellaneous
4