EMP M blueprint

Manufacturing blueprint

EMP M

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
449 427 405 3.89 1.75k
417 397 376 16.63 6.93k
7 7 7 52.42 366.94

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 121.08 ISK
ME 0 ME 5 ME 10
Materials / unit 9.05k 8.63k 8.2k
Profit / unit -8.93k -8.51k -8.07k
Margin -7,373.0% -7,027.6% -6,668.5%