EMP S blueprint

Manufacturing blueprint

EMP S

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
204 194 184 3.89 793.56
17 17 16 16.63 282.71
1 1 1 705.26 705.26

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 26.79 ISK
ME 0 ME 5 ME 10
Materials / unit 1.78k 1.74k 1.69k
Profit / unit -1.75k -1.72k -1.66k
Margin -6,550.0% -6,404.8% -6,197.5%