Standup M-Set Asteroid Ore Grading Processor II blueprint

Manufacturing blueprint

Standup M-Set Asteroid Ore Grading Processor II

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
1 1 1 580.71 580.71
2 2 2 1.71m 3.41m
16 16 15 1.62m 25.87m
16 16 15 71.16k 1.14m
300 285 270 2.2m 660.78m
300 285 270 291.76k 87.53m
760 722 684 159.61k 121.3m
760 722 684 114.23k 86.81m
760 722 684 468.21k 355.84m
760 722 684 38.67k 29.39m
760 722 684 4.93k 3.75m

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 1.4b ISK
ME 0 ME 5 ME 10
Materials / unit 1.38b 1.31b 1.24b
Profit / unit 27.48m 94.75m 163.71m
Margin 2.0% 6.8% 11.7%