Manufacturing blueprint
Standup L-Set Basic Medium Ship Manufacturing Efficiency I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 3,600 | 3,420 | 3,240 | 2.92k | 10.51m | |
| 7,200 | 6,840 | 6,480 | 113.16k | 814.73m | |
| 10,800 | 10,260 | 9,720 | 7.21k | 77.92m | |
| 12,000 | 11,400 | 10,800 | 61.86k | 742.38m | |
| 12,000 | 11,400 | 10,800 | 9.36k | 112.34m | |
| 12,000 | 11,400 | 10,800 | 4.87k | 58.41m | |
| 12,000 | 11,400 | 10,800 | 83.2k | 998.44m | |
| 12,000 | 11,400 | 10,800 | 636.77 | 7.64m | |
| 12,000 | 11,400 | 10,800 | 715.4 | 8.58m | |
| 12,000 | 11,400 | 10,800 | 18.26k | 219.15m |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
—
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 3.05b | 2.9b | 2.75b |
| Profit / unit | — | — | — |
| Margin | — | — | — |
Some items have no Jita price; figures are partial.