Standup M-Set Basic Large Ship Manufacturing Time Efficiency II blueprint

Manufacturing blueprint

Standup M-Set Basic Large Ship Manufacturing Time Efficiency II

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
1 1 1 584.78 584.78
16 16 15 237.5k 3.8m
20 19 18 1.62m 32.34m
28 27 26 19.52k 546.58k
200 190 180 2.2m 440.52m
200 190 180 291.76k 58.35m
200 190 180 5.29k 1.06m
1,000 950 900 1.27k 1.27m
1,200 1,140 1,080 114.23k 137.07m
1,200 1,140 1,080 468.21k 561.85m
1,200 1,140 1,080 4.93k 5.92m

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price —
ME 0 ME 5 ME 10
Materials / unit 1.24b 1.18b 1.12b
Profit / unit — — —
Margin — — —

Some items have no Jita price; figures are partial.