Manufacturing blueprint
Standup M-Set Basic Medium Ship Manufacturing Time Efficiency II
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 1 | 1 | 1 | 584.78 | 584.78 | |
| 16 | 16 | 15 | 237.5k | 3.8m | |
| 20 | 19 | 18 | 1.62m | 32.34m | |
| 28 | 27 | 26 | 19.52k | 546.58k | |
| 200 | 190 | 180 | 2.2m | 440.52m | |
| 200 | 190 | 180 | 291.76k | 58.35m | |
| 200 | 190 | 180 | 5.29k | 1.06m | |
| 1,000 | 950 | 900 | 1.27k | 1.27m | |
| 1,200 | 1,140 | 1,080 | 114.23k | 137.07m | |
| 1,200 | 1,140 | 1,080 | 468.21k | 561.85m | |
| 1,200 | 1,140 | 1,080 | 4.93k | 5.92m |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
—
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 1.24b | 1.18b | 1.12b |
| Profit / unit | — | — | — |
| Margin | — | — | — |
Some items have no Jita price; figures are partial.