Standup M-Set Basic Medium Ship Manufacturing Time Efficiency I blueprint

Manufacturing blueprint

Standup M-Set Basic Medium Ship Manufacturing Time Efficiency I

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
960 912 864 113.16k 108.63m
1,440 1,368 1,296 7.21k 10.39m
1,600 1,520 1,440 61.86k 98.98m
1,600 1,520 1,440 9.36k 14.98m
1,600 1,520 1,440 4.87k 7.79m
1,600 1,520 1,440 83.2k 133.13m
1,600 1,520 1,440 636.77 1.02m
1,600 1,520 1,440 715.4 1.14m
1,600 1,520 1,440 18.26k 29.22m

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price —
ME 0 ME 5 ME 10
Materials / unit 405.28m 385.01m 364.75m
Profit / unit — — —
Margin — — —

Some items have no Jita price; figures are partial.