Manufacturing blueprint
Equite I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 400 | 380 | 360 | 2k | 799.93k | |
| 500 | 475 | 450 | 1.04k | 520.33k | |
| 900 | 855 | 810 | 705.26 | 634.73k | |
| 6,000 | 5,700 | 5,400 | 191.17 | 1.15m | |
| 15,000 | 14,250 | 13,500 | 52.42 | 786.3k | |
| 45,000 | 42,750 | 40,500 | 16.63 | 748.35k | |
| 165,000 | 156,750 | 148,500 | 3.89 | 641.85k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
5.4m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 5.28m | 5.01m | 4.75m |
| Profit / unit | 122.64k | 386.57k | 650.5k |
| Margin | 2.3% | 7.2% | 12.0% |