Manufacturing blueprint
Standup M-Set Equipment Manufacturing Time Efficiency II
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 |
|---|---|---|---|
| 1 | 1 | 1 | |
| 8 | 8 | 8 | |
| 14 | 14 | 13 | |
| 14 | 14 | 13 | |
| 250 | 238 | 225 | |
| 250 | 238 | 225 | |
| 250 | 238 | 225 | |
| 1,200 | 1,140 | 1,080 | |
| 1,200 | 1,140 | 1,080 | |
| 1,200 | 1,140 | 1,080 | |
| 1,200 | 1,140 | 1,080 |