Manufacturing blueprint
Standup XL-Set Equipment and Consumable Manufacturing Efficiency I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 |
|---|---|---|---|
| 36,000 | 34,200 | 32,400 | |
| 72,000 | 68,400 | 64,800 | |
| 108,000 | 102,600 | 97,200 | |
| 120,000 | 114,000 | 108,000 | |
| 120,000 | 114,000 | 108,000 | |
| 120,000 | 114,000 | 108,000 | |
| 120,000 | 114,000 | 108,000 | |
| 120,000 | 114,000 | 108,000 | |
| 120,000 | 114,000 | 108,000 | |
| 120,000 | 114,000 | 108,000 |