Thukker Component Assembly Array blueprint

Manufacturing blueprint

Thukker Component Assembly Array

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
1 1 1 13.13m 13.13m

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 13.13m ISK
ME 0 ME 5 ME 10
Materials / unit 13.13m 13.13m 13.13m
Profit / unit 0 0 0
Margin 0.0% 0.0% 0.0%