Barghest blueprint

Manufacturing blueprint

Barghest

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
1 1 1 3.25m 3.25m
120 114 108 93.35k 11.2m
160 152 144 2.22m 355.62m
240 228 216 50.56k 12.14m
4,800 4,560 4,320 2k 9.6m
9,600 9,120 8,640 1.04k 9.99m
36,000 34,200 32,400 705.26 25.39m
480,000 456,000 432,000 191.17 91.76m
720,000 684,000 648,000 52.42 37.74m
4,800,000 4,560,000 4,320,000 16.63 79.82m
9,600,000 9,120,000 8,640,000 3.89 37.34m

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 926.31m ISK
ME 0 ME 5 ME 10
Materials / unit 673.86m 640.33m 606.8m
Profit / unit 252.45m 285.98m 319.51m
Margin 27.3% 30.9% 34.5%