Gecko blueprint

Manufacturing blueprint

Gecko

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
1 1 1 437.71 437.71
2 2 2 2.47m 4.93m
3 3 3 29.93k 89.79k
5 5 5 16.39k 81.94k
5 5 5 17.48k 87.39k
6 6 6 4.25k 25.48k
9 9 9 26.08k 234.74k
10 10 9 2k 20k
10 10 9 237.32k 2.37m
10 10 9 3.14m 31.43m
14 14 13 17.8k 249.2k
16 16 15 2.69k 43.06k
18 18 17 83.03k 1.49m
18 18 17 84.37k 1.52m
18 18 17 18.03k 324.54k
36 35 33 1.04k 37.46k
55 53 50 705.26 38.79k
105 100 95 191.17 20.07k
6,420 6,099 5,778 16.63 106.76k
12,150 11,543 10,935 3.89 47.26k

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 210.83m ISK
ME 0 ME 5 ME 10
Materials / unit 43.15m 43.14m 39.54m
Profit / unit 167.68m 167.7m 171.3m
Margin 79.5% 79.5% 81.2%