Scan Pinpointing Array I blueprint

Manufacturing blueprint

Scan Pinpointing Array I

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
7,252 6,890 6,527 3.89 28.21k
104 99 94 16.63 1.73k
3 3 3 52.42 157.26
8 8 8 191.17 1.53k
1 1 1 705.26 705.26
2 2 2 18.03k 36.06k

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 87.52k ISK
ME 0 ME 5 ME 10
Materials / unit 68.39k 66.9k 65.41k
Profit / unit 19.12k 20.62k 22.11k
Margin 21.9% 23.6% 25.3%