Manufacturing blueprint
Medium Warhead Calefaction Catalyst II
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 5 | 5 | 5 | 237.5k | 1.19m | |
| 8 | 8 | 8 | 1.84m | 14.72m | |
| 1 | 1 | 1 | 547.49 | 547.49 | |
| 6 | 6 | 6 | 159.61k | 957.67k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
18.87m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 16.86m | 16.86m | 16.86m |
| Profit / unit | 2.01m | 2.01m | 2.01m |
| Margin | 10.6% | 10.6% | 10.6% |