Manufacturing blueprint
Capital Energy Metastasis Adjuster I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 333 | 317 | 300 | 9.36k | 3.12m | |
| 500 | 475 | 450 | 7.21k | 3.61m | |
| 444 | 422 | 400 | 715.4 | 317.64k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
22.46m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 7.04m | 6.7m | 6.34m |
| Profit / unit | 15.42m | 15.77m | 16.12m |
| Margin | 68.6% | 70.2% | 71.8% |