Manufacturing blueprint
Capital Energy Discharge Elutriation II
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 75 | 72 | 68 | 4.93k | 370.1k | |
| 30 | 29 | 27 | 114.23k | 3.43m | |
| 75 | 72 | 68 | 19.52k | 1.46m | |
| 1 | 1 | 1 | 547.49 | 547.49 |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
4.29m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 5.26m | 5.07m | 4.75m |
| Profit / unit | -971.56k | -783.96k | -457.68k |
| Margin | -22.6% | -18.3% | -10.7% |