Manufacturing blueprint
Capital Energy Collision Accelerator II
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 120 | 114 | 108 | 4.93k | 592.16k | |
| 158 | 151 | 143 | 114.23k | 18.05m | |
| 188 | 179 | 170 | 19.52k | 3.67m | |
| 1 | 1 | 1 | 547.49 | 547.49 |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
13.1m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 22.31m | 21.31m | 20.19m |
| Profit / unit | -9.22m | -8.21m | -7.09m |
| Margin | -70.4% | -62.7% | -54.2% |