Capital Energy Collision Accelerator I blueprint

Manufacturing blueprint

Capital Energy Collision Accelerator I

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
578 550 521 9.36k 5.41m
689 655 621 7.21k 4.97m
444 422 400 715.4 317.64k

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 92.54m ISK
ME 0 ME 5 ME 10
Materials / unit 10.7m 10.18m 9.64m
Profit / unit 81.84m 82.36m 82.9m
Margin 88.4% 89.0% 89.6%