Manufacturing blueprint
Capital Energy Burst Aerator II
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 120 | 114 | 108 | 4.93k | 592.16k | |
| 135 | 129 | 122 | 114.23k | 15.42m | |
| 173 | 165 | 156 | 19.52k | 3.38m | |
| 1 | 1 | 1 | 547.49 | 547.49 |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
37.79m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 19.39m | 18.52m | 17.51m |
| Profit / unit | 18.4m | 19.27m | 20.27m |
| Margin | 48.7% | 51.0% | 53.6% |