Manufacturing blueprint
Capital Energy Burst Aerator I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 511 | 486 | 460 | 9.36k | 4.78m | |
| 633 | 602 | 570 | 7.21k | 4.57m | |
| 444 | 422 | 400 | 715.4 | 317.64k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
74.95m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 9.67m | 9.19m | 8.7m |
| Profit / unit | 65.28m | 65.76m | 66.25m |
| Margin | 87.1% | 87.7% | 88.4% |