Manufacturing blueprint
Small Gravity Capacitor Upgrade I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 4 | 4 | 4 | 7.21k | 28.86k | |
| 2 | 2 | 2 | 636.77 | 1.27k | |
| 3 | 3 | 3 | 715.4 | 2.15k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
37.4k ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 32.28k | 32.28k | 32.28k |
| Profit / unit | 5.12k | 5.12k | 5.12k |
| Margin | 13.7% | 13.7% | 13.7% |