Shadow Control Tower blueprint

Manufacturing blueprint

Shadow Control Tower

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
3,500,000 3,325,000 3,150,000 3.89 13.62m
583,333 554,167 525,000 16.63 9.7m
175,000 166,250 157,500 52.42 9.17m
58,333 55,417 52,500 191.17 11.15m
29,167 27,709 26,251 705.26 20.57m
46,666 44,333 42,000 1.04k 48.56m
17,500 16,625 15,750 2k 35m
1 1 1 430.77m 430.77m

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 4.5b ISK
ME 0 ME 5 ME 10
Materials / unit 578.54m 571.15m 563.77m
Profit / unit 3.92b 3.93b 3.94b
Margin 87.1% 87.3% 87.5%