Shadow Control Tower Medium blueprint

Manufacturing blueprint

Shadow Control Tower Medium

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
1,750,000 1,662,500 1,575,000 3.89 6.81m
291,667 277,084 262,501 16.63 4.85m
87,500 83,125 78,750 52.42 4.59m
29,167 27,709 26,251 191.17 5.58m
14,583 13,854 13,125 705.26 10.28m
23,334 22,168 21,001 1.04k 24.28m
8,748 8,311 7,874 2k 17.49m
1 1 1 247.89m 247.89m

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price —
ME 0 ME 5 ME 10
Materials / unit 321.77m 318.08m 314.39m
Profit / unit — — —
Margin — — —

Some items have no Jita price; figures are partial.