Serpentis Control Tower Small blueprint

Manufacturing blueprint

Serpentis Control Tower Small

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
1 1 1 115.76m 115.76m
833,333 791,667 750,000 3.89 3.24m
138,889 131,945 125,001 16.63 2.31m
41,667 39,584 37,501 52.42 2.18m
13,889 13,195 12,501 191.17 2.66m
6,944 6,597 6,250 705.26 4.9m
11,112 10,557 10,001 1.04k 11.56m
4,166 3,958 3,750 2k 8.33m

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price —
ME 0 ME 5 ME 10
Materials / unit 150.94m 149.19m 147.43m
Profit / unit — — —
Margin — — —

Some items have no Jita price; figures are partial.