Large Ship Assembly Array blueprint

Manufacturing blueprint

Large Ship Assembly Array

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
1 1 1 156.93m 156.93m

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 156.93m ISK
ME 0 ME 5 ME 10
Materials / unit 156.93m 156.93m 156.93m
Profit / unit 0 0 0
Margin 0.0% 0.0% 0.0%