Manufacturing blueprint
Large Projectile Collision Accelerator II
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 38 | 37 | 35 | 19.52k | 741.78k | |
| 24 | 23 | 22 | 4.93k | 118.43k | |
| 32 | 31 | 29 | 468.21k | 14.98m | |
| 1 | 1 | 1 | 547.49 | 547.49 |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
21.29m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 15.84m | 15.35m | 14.37m |
| Profit / unit | 5.45m | 5.94m | 6.92m |
| Margin | 25.6% | 27.9% | 32.5% |