Manufacturing blueprint
Large Warhead Calefaction Catalyst II
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 24 | 23 | 22 | 237.5k | 5.7m | |
| 38 | 37 | 35 | 1.84m | 69.91m | |
| 1 | 1 | 1 | 547.49 | 547.49 | |
| 32 | 31 | 29 | 159.61k | 5.11m |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
96.13m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 80.72m | 78.48m | 74.24m |
| Profit / unit | 15.41m | 17.65m | 21.89m |
| Margin | 16.0% | 18.4% | 22.8% |