Large Warhead Calefaction Catalyst II blueprint

Manufacturing blueprint

Large Warhead Calefaction Catalyst II

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
24 23 22 237.5k 5.7m
38 37 35 1.84m 69.91m
1 1 1 547.49 547.49
32 31 29 159.61k 5.11m

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 96.13m ISK
ME 0 ME 5 ME 10
Materials / unit 80.72m 78.48m 74.24m
Profit / unit 15.41m 17.65m 21.89m
Margin 16.0% 18.4% 22.8%