Manufacturing blueprint
Large Bay Loading Accelerator II
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 24 | 23 | 22 | 237.5k | 5.7m | |
| 35 | 34 | 32 | 1.84m | 64.39m | |
| 1 | 1 | 1 | 547.49 | 547.49 | |
| 27 | 26 | 25 | 159.61k | 4.31m |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
77.07m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 74.4m | 72.16m | 68.09m |
| Profit / unit | 2.67m | 4.9m | 8.98m |
| Margin | 3.5% | 6.4% | 11.7% |