Manufacturing blueprint
Large Ionic Field Projector I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 111 | 106 | 100 | 42.17k | 4.68m | |
| 89 | 85 | 81 | 636.77 | 56.67k | |
| 111 | 106 | 100 | 715.4 | 79.41k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
6.55m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 4.82m | 4.6m | 4.34m |
| Profit / unit | 1.73m | 1.95m | 2.21m |
| Margin | 26.4% | 29.8% | 33.7% |