Manufacturing blueprint
Large Emission Scope Sharpener I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 44 | 42 | 40 | 18.26k | 803.54k | |
| 89 | 85 | 81 | 636.77 | 56.67k | |
| 111 | 106 | 100 | 2.92k | 324.18k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
1.33m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 1.18m | 1.13m | 1.07m |
| Profit / unit | 142.91k | 196.59k | 253.18k |
| Margin | 10.8% | 14.8% | 19.1% |