Manufacturing blueprint
Large Drone Scope Chip I
SDE base materials and required skills for this manufacturing blueprint.
Materials
Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).
Base materials
| Material | Base | ME 5 | ME 10 | Unit price | Cost |
|---|---|---|---|---|---|
| 83 | 79 | 75 | 42.17k | 3.5m | |
| 44 | 42 | 40 | 2.27k | 99.78k | |
| 72 | 69 | 65 | 715.4 | 51.51k |
Profitability (Jita)
Per unit of product, at Jita average prices.
Produces 1 per run
Product price
4.15m ISK
| ME 0 | ME 5 | ME 10 | |
|---|---|---|---|
| Materials / unit | 3.65m | 3.48m | 3.3m |
| Profit / unit | 495.51k | 670.86k | 846.93k |
| Margin | 11.9% | 16.2% | 20.4% |