Structure Reprocessing Plant blueprint

Manufacturing blueprint

Structure Reprocessing Plant

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
5 5 5 1.25m 6.25m
5 5 5 1.27m 6.36m
5 5 5 2.31m 11.53m
10 10 9 1.09m 10.88m
10 10 9 2.01m 20.13m
300 285 270 2k 599.95k
700 665 630 1.04k 728.46k
1,500 1,425 1,350 705.26 1.06m
8,000 7,600 7,200 191.17 1.53m
70,000 66,500 63,000 52.42 3.67m
200,000 190,000 180,000 16.63 3.33m
1,000,000 950,000 900,000 3.89 3.89m

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 74.55m ISK
ME 0 ME 5 ME 10
Materials / unit 69.94m 69.2m 65.36m
Profit / unit 4.61m 5.35m 9.19m
Margin 6.2% 7.2% 12.3%