Structure Storage Bay blueprint

Manufacturing blueprint

Structure Storage Bay

SDE base materials and required skills for this manufacturing blueprint.

Materials

Quantities per run; unit prices and costs are Jita averages. ME columns are illustrative (structure/rig bonuses not included).

Base materials

Material Base ME 5 ME 10 Unit price Cost
3 3 3 2.56m 7.67m
3 3 3 1.25m 3.75m
3 3 3 1.09m 3.26m
3 3 3 1.27m 3.82m
5 5 5 2.03m 10.15m
5 5 5 2.31m 11.53m
150 143 135 2k 299.97k
350 333 315 1.04k 364.23k
750 713 675 705.26 528.95k
4,000 3,800 3,600 191.17 764.68k
35,000 33,250 31,500 52.42 1.83m
100,000 95,000 90,000 16.63 1.66m
500,000 475,000 450,000 3.89 1.95m

Profitability (Jita)

Per unit of product, at Jita average prices.

Produces 1 per run Product price 49.65m ISK
ME 0 ME 5 ME 10
Materials / unit 47.59m 47.22m 46.85m
Profit / unit 2.06m 2.43m 2.8m
Margin 4.1% 4.9% 5.6%