Large Egress Port Maximizer II

This ship modification is designed to reduce a ship's capacitor need for all energy emission modules.

  • structure
  • 200 kg

    Mass

  • 20m³ packaged

    Volume

  • 40

    Structure Hitpoints

  • miscellaneous
  • -20

    Capacitor Need Bonus

  • 2

    Tech Level

  • 5

    Meta Level

  • 150

    Calibration Cost

  • Large

    Rig Size

  • blueprint
  • Large Egress Port Maximizer II Blueprint

  • manufacturing
  • base materials
  • 12

    Power Conduit

  • 20

    Power Circuit

  • 23

    Interface Circuit

  • extra materials and skills
  • V

    Industry

  • I

    High Energy Physics

  • I

    Quantum Physics

  • 1

    R.A.M.- Energy Tech

  • I

    Jury Rigging

  • reprocessing
  • material/salvaged materials
  • 12

    Power Conduit

  • 20

    Power Circuit

  • 23

    Interface Circuit

  • other
  • 4

    Required Skill 1Level