Guristas Ship Log 365764054

This salvaged data from a destroyed Guristas vessel reveals the following:
"Construction parts for the battlestation are being ferried and stored at the outpost in Oijanen. Station personnel training is under way in Venal HQ, estimated to be completed a day after construction completion. The blueprints are to be destroyed in the station incinerator as soon as it has been verified to operate successfully."

  • structure
  • 1 kg

    Mass

  • 0.1m³ packaged

    Volume

  • reprocessing
  • material/mineral
  • 2

    Isogen

  • 6

    Nocxium